High voltage 1.97MW / 8.1MWh

Register free to see price and documents
Open the project page (price, documents, Q&A)

Already registered? Log in

About this project

Area
?The electric utility service territory (Tokyo = TEPCO territory, Kyushu = Kyushu Electric territory, and so on). Market data
Chubu
Prefecture
Aichi
Voltage
?A plant connected to a 6,600V distribution line (typically about 2MW). Glossary
High voltage
Size
?MW is how much power can flow in or out at once; MWh is how much energy can be stored. Glossary
1.97MW / 8.1MWh
Sale type
?You take over a finished, built battery storage plant. Glossary
Completed (turnkey)
Grid procedure
?The cost of the grid connection works (the connection charge) has been paid to the utility. Glossary
Contribution paid
Expected start of operation
FY2027
Listed on
2026-11-24
Project number
HV-634

Questions

When is the seller's company name shared?

Once a meeting date is set, ScienceX tells each side the other's company name and attendees.

How far has the grid procedure progressed?

Contribution paid: The cost of the grid connection works (the connection charge) has been paid to the utility.

Other projects in the same area

All projects in this area →

Prices, documents and Q&A are shown after free registration. Register free → Log in

日本語