KumamotoKyushuGrid-connected
High voltage 2MW / 8MWh
Completed (turnkey)In the balancing market
2026-10-06 listed · HV-279
Already registered? Log in
Once a meeting date is set, ScienceX tells each side the other's company name and attendees.
Grid connection study answered: The utility has answered whether the plant can connect, with the expected cost and timing of the grid works.
Prices, documents and Q&A are shown after free registration. Register free → Log in