High voltage 2MW / 7.7MWh

Register free to see price and documents
Open the project page (price, documents, Q&A)

Free, about a minute. Free email addresses are fine. Already registered? Log in

About this project

Area
?The electric utility service territory (Tokyo = TEPCO territory, Kyushu = Kyushu Electric territory, and so on). Market data
Chubu
Prefecture
Mie
Voltage
?A plant connected to a 6,600V distribution line (typically about 2MW). Glossary
High voltage
Size
?MW is how much power can flow in or out at once; MWh is how much energy can be stored. Glossary
2MW / 7.7MWh
Sale type
?You take over the land and the right to connect to the utility grid; the buyer builds the plant. Glossary
Rights transfer
Grid procedure
?The utility has answered the grid connection study: whether the plant can connect, with the expected cost and timing of the grid works. Glossary
Study answered
Listed on
2026-11-28
Project number
HV-640

Questions

When is the seller's company name shared?

Once a meeting date is set, ScienceX tells each side the other's company name and attendees.

How far has the grid procedure progressed?

Study answered: The utility has answered the grid connection study: whether the plant can connect, with the expected cost and timing of the grid works.

Not ready to register? Get new projects by email →

Other projects in the same area

All projects in this area →

Prices, documents and Q&A are shown after free registration. Register free → Log in

日本語