High voltage 1.93MW / 8MWh

Register free to see price and documents
Open the project page (price, documents, Q&A)

Free, about a minute. Free email addresses are fine. Already registered? Log in

About this project

Area
?The electric utility service territory (Tokyo = TEPCO territory, Kyushu = Kyushu Electric territory, and so on). Market data
Tokyo (TEPCO)
Prefecture
Gunma
Voltage
?A plant connected to a 6,600V distribution line (typically about 2MW). Glossary
High voltage
Size
?MW is how much power can flow in or out at once; MWh is how much energy can be stored. Glossary
1.93MW / 8MWh
Sale type
?You take over a finished, built battery storage plant. Glossary
Completed (turnkey)
Grid procedure
?The cost of the grid connection works (the connection charge) has been paid to the utility. Glossary
Contribution paid
Expected start of operation
FY2026
Terrain (height difference)
Gentle slope
Land category (register)
Mainly farmland (rice / farm fields)
Urbanization control area
Outside the urbanization control area
Nearest building
Under 30 m
Listed on
2026-11-28
Project number
HV-641

Land data: processed from GSI Tiles (Geospatial Information Authority of Japan) and National Land Numerical Information (MLIT); land category from the land register. Reference only.

Questions

When is the seller's company name shared?

Once a meeting date is set, ScienceX tells each side the other's company name and attendees.

How far has the grid procedure progressed?

Contribution paid: The cost of the grid connection works (the connection charge) has been paid to the utility.

Not ready to register? Get new projects by email →

Other projects in the same area

All projects in this area →

Prices, documents and Q&A are shown after free registration. Register free → Log in

日本語