Extra-high voltage 29.95MW / 119.8MWh

Register free to see price and documents
Open the project page (price, documents, Q&A)

Already registered? Log in

About this project

Area
?The electric utility service territory (Tokyo = TEPCO territory, Kyushu = Kyushu Electric territory, and so on). Market data
Kyushu
Prefecture
Saga
Voltage
?A large plant connected to a transmission line. Glossary
Extra-high voltage
Size
?MW is how much power can flow in or out at once; MWh is how much energy can be stored. Glossary
29.95MW / 119.8MWh
Sale type
?You take over the land and the right to connect to the utility grid; the buyer builds the plant. Glossary
Rights transfer
Grid procedure
?The utility has answered the grid connection study: whether the plant can connect, with the expected cost and timing of the grid works. Glossary
Study answered
Listed on
2026-11-24
Project number
SHV-635

Questions

When is the seller's company name shared?

Once a meeting date is set, ScienceX tells each side the other's company name and attendees.

How far has the grid procedure progressed?

Study answered: The utility has answered the grid connection study: whether the plant can connect, with the expected cost and timing of the grid works.

Other projects in the same area

KumamotoKyushuGrid-connected

High voltage 2MW / 8MWh

Completed (turnkey)In the balancing market
2026-10-06 listed · HV-279

All projects in this area →

Prices, documents and Q&A are shown after free registration. Register free → Log in

日本語