HyogoKansai
High voltage 2MW / 8MWh
Rights transfer
- Grid procedure
- Grid connection study answered
- Expected start
- FY2027
2026-11-11 listed · HV-538See this project
Project UR-1: Grid-scale battery storage project for sale in Shiga, Kansai area: High voltage, 2MW / 8MWh, Completed (turnkey). Grid procedure: Grid connection cost confirmed. Expected start of operation: FY2028. Price and documents are shown after free registration on Chikudensho Market.
This page shows the area, scale and grid stage only. Price, the exact location and documents are shown after free registration.