KumamotoKyushuGrid-connected
High voltage 2MW / 8MWh
Completed (turnkey)
- Grid procedure
- Connected to the grid
2026-10-06 listed · HV-279See this project
17 battery storage projects in Kumamoto Prefecture for sale on Chikudensho Market (completed: 14, rights transfer: 3). Browse by size, grid procedure stage and expected start of operation. Prices and redacted documents are shown after free registration. Operated by ScienceX Inc.
This page shows prefecture, scale and grid stage only. Prices and documents are shown after free registration.
Already registered? Log in
17 projects