IbarakiTokyo (TEPCO)
Extra-high voltage 50.82MW / 203.3MWh
Rights transfer
- Grid procedure
- Grid connection study answered
- Expected start
- FY2030
2026-09-30 listed · SHV-366See this project
Project HV-552: Grid-scale battery storage project for sale in Gunma, Tokyo (TEPCO) area: High voltage, Rights transfer. Grid procedure: Grid connection study answered. Expected start of operation: FY2028. Price and documents are shown after free registration on Chikudensho Market.