Chikudensho Market Operated by ScienceX Inc.
Project on sale · Ibaraki

Extra-high voltage 50.82MW / 203.3MWh

Project SHV-366: Grid-scale battery storage project for sale in Ibaraki, Tokyo (TEPCO) area: Extra-high voltage, 50.82MW / 203.3MWh, Rights transfer. Grid procedure: Grid connection study answered. Expected start of operation: FY2030. Price and documents are shown after free registration on Chikudensho Market.

This page shows the area, scale and grid stage only. Price, the exact location and documents are shown after free registration.

Already registered? Log in

About this project

Area
?The electric utility service territory (Tokyo = TEPCO territory, Kyushu = Kyushu Electric territory, and so on).
Tokyo (TEPCO)
Prefecture
Ibaraki
Voltage
?A large plant connected to a transmission line.
Extra-high voltage
Size
?MW is how much power can flow in or out at once; MWh is how much energy can be stored.
50.82MW / 203.3MWh
Sale type
?You take over the land and the right to connect to the utility grid; the buyer builds the plant.
Rights transfer
Grid procedure
?The utility has answered whether the plant can connect, with the expected cost and timing of the grid works.
Grid connection study answered
Expected start of operation
FY2030
Listed on
2026-09-30
Project number
SHV-366

What you can see after free registration

Register freeCompany email, name and mobile number, plus agreeing to the confidentiality pledge. Free.

Other projects in the same area

GunmaTokyo (TEPCO)

High voltage

Rights transfer
Grid procedure
Grid connection study answered
Expected start
FY2028
2026-11-14 listed · HV-552See this project
KanagawaTokyo (TEPCO)

High voltage

Rights transfer
Grid procedure
Grid connection study answered
Expected start
FY2027
2026-11-11 listed · HV-540See this project

All projects in this area →

Company names stay hidden until a meeting is set
ScienceX checks every project and request before it reaches you
Documents are shared with names and account details removed
日本語