High voltage 1.99MW / 9MWh

Register free to see price and documents
Open the project page (price, documents, Q&A)

Already registered? Log in

About this project

Area
?The electric utility service territory (Tokyo = TEPCO territory, Kyushu = Kyushu Electric territory, and so on). Market data
Kyushu
Prefecture
Kumamoto
Voltage
?A plant connected to a 6,600V distribution line (typically about 2MW). Glossary
High voltage
Size
?MW is how much power can flow in or out at once; MWh is how much energy can be stored. Glossary
1.99MW / 9MWh
Sale type
?You take over a finished, built battery storage plant. Glossary
Completed (turnkey)
Grid procedure
?The utility has answered the grid connection study: whether the plant can connect, with the expected cost and timing of the grid works. Glossary
Study answered
Terrain (height difference)
Some slope
Urbanization control area
Outside the urbanization control area
Nearest building
Under 30 m
Listed on
2026-11-22
Project number
HV-622

Land data: processed from GSI Tiles (Geospatial Information Authority of Japan) and National Land Numerical Information (MLIT); land category from the land register. Reference only.

Questions

When is the seller's company name shared?

Once a meeting date is set, ScienceX tells each side the other's company name and attendees.

How far has the grid procedure progressed?

Study answered: The utility has answered the grid connection study: whether the plant can connect, with the expected cost and timing of the grid works.

Other projects in the same area

KumamotoKyushuGrid-connected

High voltage 2MW / 8MWh

Completed (turnkey)In the balancing market
2026-10-06 listed · HV-279

All projects in this area →

Prices, documents and Q&A are shown after free registration. Register free → Log in

日本語