About this project

Area
?The electric utility service territory (Tokyo = TEPCO territory, Kyushu = Kyushu Electric territory, and so on). Market data
Kansai
Prefecture
Wakayama
Voltage
?A plant connected to a 6,600V distribution line (typically about 2MW). Glossary
High voltage
Size
?MW is how much power can flow in or out at once; MWh is how much energy can be stored. Glossary
2MW / 8MWh
Sale type
?You take over a finished, built battery storage plant. Glossary
Completed (turnkey)
Grid procedure
?The utility has given its formal reply on the grid works, their cost and timing. Glossary
Final reply received
Listed on
2026-11-26
Project number
HV-638

Questions

When is the seller's company name shared?

Once a meeting date is set, ScienceX tells each side the other's company name and attendees.

How far has the grid procedure progressed?

Final reply received: The utility has given its formal reply on the grid works, their cost and timing.