We will buy battery storage!

The buyers below will buy battery storage that matches these conditions. Prices and buyer details are shown after free registration. If you have a project, or land with grid rights (development rights), and want to sell, propose it. Company names are shared once a meeting is set.

Want a finished plantCompleted · 3

Voltage
High voltage
Operation start
By Mar 2028
Grid procedure
Deposit paid (or beyond)
Equipment
Buyer can choose
Distance from houses
50m or more
Access road
Road passable for trailers and cranes (4m wide or more)
Flood depth
0.5m or less
Landslide hazard zone
Not acceptable
Make this buyer an offer (free sign-up)
2026-11-15 posted · W-017

Want land and grid rightsRights transfer · 8

Area
Tohoku, Tokyo
Voltage
High voltage
Operation start
By Sep 2027
Grid procedure
Grid connection cost paid (or beyond)
Projects
2 projects
Distance from houses
50m or more
Urbanization control area
Prefer to avoid
Access road
Road passable for trailers and cranes
Landslide hazard zone
Not acceptable
Liquefaction risk
Prefer to avoid
Seller (domestic or foreign)
Domestic company
Make this buyer an offer (free sign-up)
2026-11-16 posted · W-021
Voltage
High voltage
Operation start
By Mar 2028
Grid procedure
Deposit paid (or beyond)
Distance from houses
50m or more
Access road
Road passable for trailers and cranes (4m wide or more)
Flood depth
0.5m or less
Landslide hazard zone
Not acceptable
Make this buyer an offer (free sign-up)
2026-11-15 posted · W-016
Area
Tohoku, Tokyo, Chubu, Kansai
Preferred areas
Tokyo, Kansai
Excluded areas
Hokkaido, Hokuriku, Shikoku
Voltage
High voltage
Operation start
By Sep 2027
Projects
First 5 projects
Landslide hazard zone
Prefer to avoid
Make this buyer an offer (free sign-up)
2026-11-15 posted · W-012
Area
Tohoku, Tokyo, Chubu, Hokuriku, Kansai, Chugoku
Excluded areas
Hokkaido, Shikoku, Kyushu
Operation start
By Sep 2027
Grid procedure
Final reply received (or beyond)
Flood depth
Outside flood zones
Landslide hazard zone
Not acceptable
Make this buyer an offer (free sign-up)
2026-11-15 posted · W-008
Area
Tohoku, Tokyo, Chubu, Kansai, Chugoku, Kyushu
Preferred areas
Tokyo, Kansai
Excluded areas
Hokkaido, Hokuriku, Shikoku
Voltage
High voltage
Operation start
By Mar 2028
Grid procedure
Final reply received (or beyond)
Make this buyer an offer (free sign-up)
2026-11-15 posted · W-001

Open to eitherEither · 1